The work
What Mike does on a interior demolition job
Remodels and tenant finishes live or die on how clean the demo is. Mike takes the inside out without touching what's staying, hauls it the same day, and hands you a space the next trade can actually work in.
- Non-structural walls, ceilings, soffits
- Flooring down to slab or subfloor
- Cabinets, fixtures, millwork
- Bagged, loaded and hauled — no pile left in the parking lot
- Floors swept and ready for the next trade